Before Breaking Ground
The future site of a wooden 6x6 retaining wall spanning over 70 feet in length

Stripping Loam for Retaining Wall Base
Brush, trash and concrete removed. Next up is to strip loam and prepare the retaining wall base.

One Strong Wall
With nothing more than foot traffic expected, this wall can easily handle the surcharge from this heavy machine

Nearly Completed
Pending final cleanup and seeding, this retaining wall is nearly completed.

Before Starting The Project
The site of a soon to be boulder retaining wall.

Nearly Complete Boulder Wall
Pending cleanup and final grade/backfill, this project is complete.

Nearly Complete Boulder Wall
Pending cleanup and final grade/backfill, this project is complete.

Large Mulch Installation
The rear view of a 80 yard mulch project in Johnston RI

The Start of a Material Cleanup Project
The entire pile of dirt, debris and 3 large tree stumps (hidden) are to be removed and hauled off site to prepare for a parking lot extension.

Manure and Woodchip Removal
Hauling off around 14 yards of manure and woodchips to keep things clean on a farm in Hope, RI

Concrete Parking Lot
A muddy day preparing the base for a concrete parking lot designed for multiple Heavy Duty Class A Vechicles

Clean it up
Cleaning up large downed trees and cutting the logs into firewood.

Walls and Rough Grade Complete
This project is ready for loam, irrigation and grass seed.

3 Month Follow up

Above Ground Pool Prep
Preparing the ground for a above ground pool to be assembled

Demolish
This deck was dismantled using heavy equipment and disposed of at RIRRC

Importing Crushed Stone
When we are finishing tight areas, heavy equipment doesnt always fit, here you see us shoveling stone into a wheel barrow to bring it into a backyard for a shed pad installation